CASSINGTON PARISH COUNCIL
You are summoned to attend Cassington Parish Council Meeting at 7.30pm on Thursday 19th December 2024 in The Village Hall, Cassington
Agenda & Summons
- Apologies –
- Declarations of interest
(Any pecuniary interests should be declared also a review of current declarations of interests circulated)
- Minutes of the previous meeting held on 7th November 2024
- Comments from the Public –
- Report from Clerk
- VAS on Eynsham Road & Yarnton Road
- Balance Pond
- Planning
Previous Planning Application Decisions
APPLICATION
NO: |
LOCATION: | PROPOSAL: | APPLICANT: | DECISION: |
20/01734/OUT | Land North of A40 Section from Barnard Gate To Eynsham Roundabout Eynsham | Grosvenor Developments Ltd | UNDER
CONSIDERATION |
|
MW.0054/24 | Cassington Pit, Cassington Road, Yarnton, Oxfordshire, OX29 4EB. | 73 application for the continuation of the development permitted by MW.0122/20 (winning and working of sand and gravel with restoration using suitable imported materials) without complying with condition 6 in order to extend the time period for restoration until 31st December 2025 to allow for sufficient time to restore the plant site | Hanson Quarry Products Europe Ltd | CONSULTATION ENDS ON 2ND DECEMBER 2024 |
24/02343/HHD | 1 Barrow Court Yarnton Road Cassington | Demolition of carport and erection of a two-storey side extension, with internal
Alterations |
Mr Velimir Milivojevic | UNDER CONSIDERATION |
24/02664/PN42 | Mill View Cassington Witney Oxfordshire OX29 4DB | Erection of a single storey extension (8m x 2.3m height to eaves / 2.4m max height) | Mr N Rogers | PRIOR APPROVAL NOT REQUIRED |
OCC ref: R3.0151/21 | A40 | • The dualling of approximately 3.2km of the A40 carriageway from the existing Hill Farm junction at Witney to the Eynsham Park and Ride site (R3.0057/19) including the construction of two new roundabouts. • An eastbound and westbound bus lane approximately 6.5km in length from the Eynsham Park and Ride site to existing structures at Duke’s Cut waterway (Duke’s Cut Canal Bridge, Earl’s Culvert, Wolvercote Railway Bridge and Wolvercote Canal Bridge); • Capacity and connectivity improvements over the existing structures at Duke’s Cut waterway to enable the proposed eastbound bus lane to extend over the existing structures up to the A34 flyover in the east, forming a connection into Oxford North (Northern Gateway) strategic development site; • Construction of a new signalised junction to the Eynsham Park and Ride site; • New pedestrian/cyclist underpass at Cuckoo Lane (‘the Eynsham Underpass’). Two new pedestrian/cycle bridges at Cassington Halt (Cassington Halt Footbridge North and Cassington Halt Footbridge South); • Widening of Cassington New Bridge; • Demolition and replacement/extension of existing White House Culvert; • Demolition and replacement/extension of Barnard Gate New Culvert; • New and improved shared use footways and cycleways, including new shared use links to National Cycle Network (NCN) Route 5 at Duke’s Cut waterway; • Alterations to existing junctions and property accesses along the A40; • Controlled crossings, external lighting, noise barriers, sustainable drainage systems, landscaping, habitat creation including ecology ponds and associated hibernacula; and • All associated engineering and temporary construction works, site compound and storage areas at A40 HIF2 Smart Corridor (‘HIF2 project’) A40 corridor between Witney and Wolvercote, Oxfordshire | OCC | WITHDRAWN
26/11/24 |