Documents

December Agenda 2024

Agenda 2024 Uploaded on December 14, 2024

CASSINGTON PARISH COUNCIL

You are summoned to attend Cassington Parish Council Meeting at 7.30pm on Thursday 19th December 2024 in The Village Hall, Cassington 

Agenda & Summons

  1. Apologies –
  1. Declarations of interest

(Any pecuniary interests should be declared also a review of current declarations of interests circulated)

  1. Minutes of the previous meeting held on 7th November 2024
  1. Comments from the Public –
  1. Report from Clerk       
  • VAS on Eynsham Road & Yarnton Road
  • Balance Pond
  1. Planning

Previous Planning Application Decisions

APPLICATION

NO:

LOCATION: PROPOSAL: APPLICANT: DECISION:
20/01734/OUT Land North of A40 Section from Barnard Gate To Eynsham Roundabout Eynsham   Grosvenor Developments Ltd UNDER

CONSIDERATION

MW.0054/24 Cassington Pit, Cassington Road, Yarnton, Oxfordshire, OX29 4EB. 73 application for the continuation of the development permitted by MW.0122/20 (winning and working of sand and gravel with restoration using suitable imported materials) without complying with condition 6 in order to extend the time period for restoration until 31st December 2025 to allow for sufficient time to restore the plant site Hanson Quarry Products Europe Ltd CONSULTATION ENDS ON 2ND DECEMBER 2024
24/02343/HHD 1 Barrow Court Yarnton Road Cassington Demolition of carport and erection of a two-storey side extension, with internal

Alterations

Mr Velimir Milivojevic UNDER CONSIDERATION
24/02664/PN42 Mill View Cassington Witney Oxfordshire OX29 4DB Erection of a single storey extension (8m x 2.3m height to eaves / 2.4m max height) Mr N Rogers PRIOR APPROVAL NOT REQUIRED
OCC ref: R3.0151/21 A40 • The dualling of approximately 3.2km of the A40 carriageway from the existing Hill Farm junction at Witney to the Eynsham Park and Ride site (R3.0057/19) including the construction of two new roundabouts. • An eastbound and westbound bus lane approximately 6.5km in length from the Eynsham Park and Ride site to existing structures at Duke’s Cut waterway (Duke’s Cut Canal Bridge, Earl’s Culvert, Wolvercote Railway Bridge and Wolvercote Canal Bridge); • Capacity and connectivity improvements over the existing structures at Duke’s Cut waterway to enable the proposed eastbound bus lane to extend over the existing structures up to the A34 flyover in the east, forming a connection into Oxford North (Northern Gateway) strategic development site; • Construction of a new signalised junction to the Eynsham Park and Ride site; • New pedestrian/cyclist underpass at Cuckoo Lane (‘the Eynsham Underpass’). Two new pedestrian/cycle bridges at Cassington Halt (Cassington Halt Footbridge North and Cassington Halt Footbridge South); • Widening of Cassington New Bridge; • Demolition and replacement/extension of existing White House Culvert; • Demolition and replacement/extension of Barnard Gate New Culvert; • New and improved shared use footways and cycleways, including new shared use links to National Cycle Network (NCN) Route 5 at Duke’s Cut waterway; • Alterations to existing junctions and property accesses along the A40; • Controlled crossings, external lighting, noise barriers, sustainable drainage systems, landscaping, habitat creation including ecology ponds and associated hibernacula; and • All associated engineering and temporary construction works, site compound and storage areas at A40 HIF2 Smart Corridor (‘HIF2 project’) A40 corridor between Witney and Wolvercote, Oxfordshire OCC WITHDRAWN

26/11/24

 New Planning Applications

APPLICATION NO: LOCATION PROPOSAL APPLICANT: COMMENT DATE:
R3.0134/24 A40 Request for Scoping Opinion for proposal for the provision of bus lanes and an improved shared use facility (SUF – a combination of pedestrian and cycleway) along the existing A40 between the new Park and Ride facility at Eynsham and Oxford. at A40 between Eynsham Park and Ride and Wolvercote OCC CONSULTATION DATE ENDS 20/12/24

Botley Solar Farm – Report from Group

  1. Correspondence
  • Email from Resident with regards to the ditch on Elms Road
  1. Reports from County and District & Parish Councillors –

County Councillor

District Councillors

Parish Councillors  

  1. Ditches, Drainage and Flooding
  • Balance Pond
  • Email to Cottsway re flooding on Elms Road
  1. Maintenance/ Grants
  • Village Walls
  • Change waste bin collection
  1. Traffic
  • Speed Watch
  • Speed Indicators
  • Traffic Calming
  1. Play Area & Recreation Ground
  • Replacement Playground Equipment
  • Clerk to renew Routine Operational Inspection Qualification (ROSPA) – £881 inc VAT
  1. Finance

Payments to be approved:

Individual/Company Reason Amount
Greenfields Tree Survey £450.00
Tracey Cameron Salary & Expenses £1,111.07 (paid)
HMRC National Insurance 6 Oct – 5 Nov £35.21
WODC Green grass cut 10/09/24 £86.51
Wel Medical Defib Battery £279.54 (paid)
SLCC 2025 Membership £190.00
Village Hall December Meeting £16.00
Jake Boardman Village Maintenance £140.00

Income:

Individual/Company Reason Amount
Unity Trust Service Charge £6.00
Unity Trust Multi-pay set up charge £50.00

                 Bank Balances as of Saturday 14th December 2024 – £29,349.99 

  1. Questions from the Public
  1. Date of next meeting: Thursday 6th February 2025 in the Village Hall